英文摘要 |
1.The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution.
2.To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 58 %. The rate of the emission inspection and governed inspection are 77 %.
3.The declarations of air pollution fee for construction are 4,385 cases and air pollution fees amounted to 72,141,779 N.T. dollars; the number of air pollution fees declarations of this year is highest in three years.
Governed construction sites are 7,542 places and the amount of inspection for building sites are 9,451 times; sites information collected during routine inspection was created files on schedule;4 construction site pollution consultations were held. Constructors (80 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 107,272.68 kilometers, and PM10 volume was reduced 278.9 tons.
|