109年度臺南市營建工地污染管制 查核計畫

中文摘要 本期末報告統計期間自109年5月13日至110年04月30日止,營建工程申報開工案件計有7,808件,申報開工案件的空污費繳納總金額為298,513,342元;完工結算案件共計算6,547件,總退費金額為24,219,189元、總補繳金額31,440,468元;另外有1,292件工地因逾期申報而遭加徵滯納金及利息,所加徵總計金額為3,215,782元。而統計上述相關金額後,整體營建空污費總淨收金額為308,950,403元。另在網路雲端系統使用率方面,使用網路申報比例為35.47%,雲端下載繳款單比例為63.62%,整體網路雲端系統使用率為99.09%。 工地管制方面,施工中工地共有12,558處,執行18,851處次工地巡查,納管9,771處,納管率為77.8%;工地查核法規符合率為90.7%,其中一級工地為90.7%、二級工地為90.8%。工地污染產生量(PM10)總計為11,146.37噸,巡查納管19,297.03噸,污染量納管率96.18%,工地因設置相關防制措施而達成的削減量總計為12,222.6噸經污染管制後的排放量為7,840.86噸,污染削減率為60.92%。 在工地相關推動事項中,包含82處工地進行道路洗掃認養,洗掃執行總長度為41,389.29公里。廢土不落地調查執行比例為99%。推動14處工地舖設稻草披,面積為292,683m2,有效協助稻草去化,減少露天燃燒行為。 露天燃燒管制方面,一、二期稻作巡查面積為20,803.85公頃,共發現43件稻作露天燃燒案件,燃燒總面積為11.5公頃,另外已推廣4個單位將「勿露天燃燒」條款納入契作合約,總契作面積為807.25公頃,契作農戶共193位。在露天燃燒宣導作業方面,完成15場勿露天燃燒小型宣導說明會,透過電視跑馬燈撥放14天次並拜訪120位露燃好發區里長廣播宣導。 裸露地改善方面,有63處裸露地改善,改善面積約為63.76公頃,包含河床裸露地42.51公頃、一般裸露地21.25公頃。 民俗污染減量工作方面,前夕節慶前辦理2場跨局處協商業務會議,針對各區隊中元期間加強移除香腳避免火災、移除塑膠袋等非紙錢物品,以及細部分工事宜進行說明。辦理1場次以功代金經驗交流會議,針對以功代金配合狀況說明與問題建議進行交流討論。辦理1場功德祈福迴向法會。中元期間統計各納骨塔、寺廟、社區大樓、民眾、機關學校、公司行號、市場等,共計申請紙錢載運次數731單位次,總載運量約為595.19公噸。以功代金響應人數共4,388人,響應金額總計2,622,262元,約減少57.68公噸紙錢燒化。
中文關鍵字 營建工地污染管制查核計畫

基本資訊

專案計畫編號 EPA-109-L001-30-306 經費年度 109 計畫經費 1682.2 千元
專案開始日期 2020/05/13 專案結束日期 2021/05/12 專案主持人 王應堂
主辦單位 臺南市政府環境保護局 承辦人 鄭竹均 執行單位 堃捷工程股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 109年度臺南市營建工地污染管制查核計畫期末定稿本.pdf 47MB

“2020 Tainan City’s Construction sites Management and Inspecton Project”

英文摘要 “2020 Tainan City’s Construction sites Management and Inspecton Project” (the project) , which executed from May 13,2020 to April 30, 2021(the period), is a continuing project carried out the past years’ rountin on inspecting the construction sites and promoting latest relvent regulations. During the period, there are 7,808 new contruction sites decleard the Air Pollution Control Fees, is total amout of NT$ 298,513,342. The 6,547 cases of completed-contract construction sites with NT$24,219,189 in overpayment refunds NT$ 31,440,468 in total repayment. Besides, 1,292 cases of construction sites were an overdue declaration of air pollution control fees and been added delinquency charges to any amount not paid after the deadline. Over 1,292 cases had been imposed upon interest fee that did not pay within the deadline and over 30 days, a total amount of NT$ 3,215,782. Follow the above construction sites declared the air pollution control fees, which totaled NT$ 308,950,403. In addition, in terms of cloud system usage, the internet applying ratio is 35.47%, the payment notices ratio of internet cloud download is 63.62%, and the overall cloud system usage rate is 99.09%. In terms of the safety inspections in construction sites, there are 12,558 sites under construction and 9,771 construction sites have been inc1uded within 18,851 times of the inspecting management, and control rate was 77.8%. With respect to conformity rate 90.7% rached acceptable levels of regulatory compliance construction of the first category was 90.7% and the second was 90.8%. Through the management pollutions of the project’s inspections were 19,297.03 tons, the control rate is 96.18% with the estimated PM10 emission of construction sites was 11,146.37 tons. After through the project's management, the actual emission downed from 12,222.6 tons to 7,840.86 tons, which shows that emission reducing rate was 60.92%. Moreover, the project conducted the 82 construction sites in total among of 41,389.29-kilometer street sweeping and washing. The implementation rate of investing in waste soil was 97%, and 14 construction sites covered by 292,683m2 straw mats to reduce open- burning actually. In the control of open-burning straw, the insoections of rice cultivation area were 20,803.85 hectares, and there were still 43 sites occurred straw open-buring that burned 11.5 hectares. Then, the project made “Non-Open-Burning Artic1e" agreement with 193 contracted farmers among 4 rice manufacturing associations, total rice paddy reached 807.25 hectares.However, the project held 15 small-scale public communication activities, and published 14 days news ticker and visted 120 chiefs of Village to boradcast. On the other hand, the project conducted the barren land of investigation and consulting improvement, total of 63.76 hectare in 63 improvement sites, including 21.25 hectare of normail barren land and 42.51 hectare of river barren lands. In terms of folklore pollution reduction work, the project held 2 session for cross-bureau coordinate meeting before the Chungyuan Festival ,and explained the detail works related to strengthening the removal of incense to avoid fire, removing plastic bags and other non-paper money items. Then, we held 1 explanatory conference to exchange and discuss the situation and suggestions for denotation instead of burning ghost money. Finally, conducted 1 award ceremony of return blessing. During the period of Chungyuan Festival, there are 731 units participated in the converge-burning acitivities. Most of them are from apartment building and community 277 times, followed by the temple 140 times. The total weight of converge-burning Ghost Money is 595.19 ton, inclusive of ossuaries, temples, communities, institutions, schools, companies,and markets. In order to maximazed the project’s publicity, the project encourage citizens to replace the ghost money with charity donations. The acitivities were not only attracted 4,388 people to participat, but also accumlated donation amout of NT$2,622,262. Then, project reduced 57,68 tons of ghost paper weight from such activities.
英文關鍵字 City’s Construction sites Management and Inspecton Project”