英文摘要 |
The annual quantitative targets have reached 100% or more in accordance with the contract. The total number of diesel vehicle power meter inspections is 1,448, the number of roadside inspections is 202, the number of roadside inspections is 908, and the number of cigarettes is 259 The number of vehicles and the number of vehicle license plate recognition was 21,104. In order to increase the city’s management rate, a total of 1,200 notifications were sent to the city for vehicles with overdue labels and 502 random sampling and screening for illegal oil control Among them, 20 are submitted for analysis of sulfur content and 304 are for inspection of stop and idling.
In the part of the air quality maintenance pilot area that has been set up for control, inspections and controls have been carried out on 6 areas that have been set up this year, and a total of 15,792 vehicles were inspected. As of the end of October, the total number of inspections was 11,608, and the inspection rate was 38.5 in the first quarter. %, gradually increasing to 73.5% in the third quarter; in the promotion of the independent management plan, according to statistics, a total of 1,340 independent management labels were issued by the end of October.
In the promotion of maintenance plant certification, the main focus is to improve the inspection quality of existing maintenance plants. This year, in addition to the 108-year authorized certification maintenance plant, Yuanyuan Automobile issued an independent management label, this year authorized Hsinchu Passenger Transport, which is the first in the Taozhu Miao region The authorized passenger transport industry will inspect the exhaust emissions of its own passenger vehicles when the maintenance is completed in the factory area, issue an independent management label based on the test results, and implement the "inspection, inspection, and security" system. Send personnel to the two maintenance plants for inspection operations.
Quality assurance and quality control operations at diesel vehicle inspection stations. This plan has a dedicated quality assurance vehicle. Quality assurance tests are carried out once a month. In addition to meeting the test scope, the equipment and equipment have been sent to school every year, and the results are all acceptable. Standards; in the laboratory audit part, one internal audit was completed on June 23, 109, and the improvement was completed on July 2, 109; in addition, due to the inspection station will undergo station body repair and equipment update operations, so Laboratory certification will be terminated from October 1st.
|