This project, started from 19th May 2020 till 18th May 2021, was empowered by a contract which issued by the Bureau of Environmental Protection, Tainan City. We completed all work items before deadline. In order to make sure that the quality and quantity both met the requirements of the contract, we attended the monthly meeting of the Bureau, and followed internal QAQC plan. Schedule and quality of every work items also had been reviewed by the State Implement Plan, in order to ensure all requirements were met. Summaries of work items are as follows:
1. Database establishment, maintenance and updates
The goal of this work item is to maintain and update the emission inventory of 670 plantsand to add new emission inventory of 40 plants in database. We maintained and updated the emission inventory of 691 plants and added new emission inventory of 45 plants in database.
By the end of the project, annual emission quantities of different pollutants from stationary sources in Tainan City are as follows: 1,436tons of particles, 1,465.5tons of SOx, 3,545.1tons of NOx and 5,860.3tons of VOCs.
2. Stationary Sources Permits application documents examining and issuing, including permit inspection.
490 permits were issued, including 26 installation permits, 15 modified permits, 48 operation permits, 191 change permits, 144 renewed permits, 40 re-issued permits and 26 fuel use permits. The average review duration of the application documents was 13.6 days. 73 cases of air pollution qualified persons replacement were proposed and approved. For 10 significant cases of permit application, experts review was introduced to validate the content of the documents.
Periodic inspection for operation permits has been performed for 559 operation permits. Among them, 123 operation permits didn’t meet the contents of permits, and the discrepancy of inspection was 22%. Furthermore, the plants were asked to modify and improve the inconformity.
3. Annual emissions quantities check for the premises.
341 premises are required to report emission inventory seasonally by regulation in Tainan City. The reporting rate, for a total of 1362 reports, is 100% from 1th quarter, 2020 till 4th quarter, 2020 We also checked all reports and found that 1273 of them (93.5%) were correct, 89 of them (6.5%) were asked to improve within a limited time. On-site inspection for the reports was conducted on 167 premises; 89% of them proved correct (150 premises), 11% of premises, which was asked to improve within a limited time, showed discrepancy.
4. Using standard air pollutant testing method to inspect plumes of stationary sources.
We performed 2 plumes for dioxin testing. We also took 15 fuel samples from different plants to check if the sulfur content in the sample met the standard.
5. Control of Fugitive Dust Air Pollution from Stationary Pollution Sources.
This work item is to inspect the premises which have been specified by Management Regulations of Air Pollution Control Facilities for Fugitive Particulate Emissions of Stationary Source and to help them improving the discrepancy. 160 patrols were paid and 31 of them met the regulation, the compliance rate of the regulation was 81%.
6. Reinforcing control of dioxin.
There are 53 plants (73 plumes) in the dioxin control list. On-site regulation inspection was performed on 23 plants (26 plumes). 40 plumes were completed the testing.
7. Reinforcing control of the premises odor complaints regarding stationary sources from citizens
Periodical check for the frequent odor complains factories list of stationary sources. 386 patrols were performed, including 4 industrial parks in Tainan City.
Including13 stack and 2 outdoor odor inspections were performed, 3 of them was not compliance with the standard.
8. Other work items
(1)5 articles regarding environmental protection were posted in newspapers.
(2)To cooperate with polices and attorneys for comprehensive inspection for 14 times and checking the gravel trucks for cover net pulling compliance policy for 16 times.
(3)To help determining if plumes meet the 8D/2D requirements when applying permits as well as if they should apply for permits.
(4)To submit and summarize the work results as the Environmental Protection Administration (Taiwan) and the State Implement Plan required.
|