環境資源報告成果查詢系統

109年度宜蘭縣營建工程污染管制及空污費徵收計畫

中文摘要 本計畫以分級巡查、輔導大型工地、專案管制區等方式,推動工地主動執行空氣污染防制工作,計畫期間共完成4,293處次,平均巡查排放量達91.3%,營建工地管理辦法查核符合率為82%。(一)計畫執行期間辦理營建工程空污費申報2,758件,徵收金額新臺幣54,840,344元,在空污費稽催查報方面,共計63件開工逾期申報,總催收滯納金及利息新臺幣13,240元,先行動工案件計364件,總催收滯納金及利息新臺幣322,340元,均已完成催繳作業,未申報工程查報共計有47件,其中29件完成申報補繳營建工程空污費,已催收金額為78,033元,未到局申報19件。期間完工未結算催辦率77%。(二)計畫執行期間共巡查4,293處次工程,並協助稽查153處次,平均巡查排放量比例為91.3%,其中無缺失記點3,302處次佔75.2%,輕微缺失(違反管理辦法4點以上,8點以下) 764處次佔17.4%,嚴重缺失(違反管理辦法10點以上) 326處次佔7.4%。(三)執行開工巡查2,578處,新申報巡查納管率75%。其中第一級工程列管1,115處,巡查806處,管理辦法查核率為72%,第二級工程列管2,119處,巡查1,254處,管理辦法查核率為59%,第一級與第二級工地管理辦法查核率為64%。另外,在整體工地管理辦法查核符合率為82%,其中第一級工地為82%,第二級工地為82%。(四)期間共計輔導69處工地,藉由輔導作業,共計37處工地輔導完成改善至現況0缺失,有效提升法規符合度。加強敏感區域污染削減為目的,成立3處專案管制區分別為頭城烏石港專案管制區共列管10處,法規符合工地數為5處,法規符合率為50%,污染削減率57.1%;礁溪溫泉觀光專案管制區共列管11處,法規符合工地數為6處,法規符合率為55%,污染削減率55.2%;利澤專案管制區共列管19處,法規符合工地數9處,法規符合率為47%,污染削減率52.3%。(五)計畫期間共計盯梢29處次,經過盯梢輔導道路洗掃後,道路髒污等級皆已提升一級以上。疏濬工程運輸車輛車斗下拉覆蓋15公分攝影盯梢,攝影車輛數共計236輛次,其中13輛次為空車,而砂石車輛符合營建工程管理辦法車輛數有219輛次,不符合者有4輛次,攝影砂石車覆蓋率為98%。(六)網路申報使用率達75%;完工結算申報共計2,325件,採用網路申報計1,718件,網路申報使用率達74%。(七)執行營建廢棄物查核333件次,累積查核營建工地279處,現場查核有缺失之營建工地計62處,經輔導後60處改善完成。(八)營建工地執行道路認養共計116處,新增認養共計44處,累積洗掃街總里程22,585公里,推估TSP污染削減311.7公噸,PM10削減58.7公噸。經逐月查核道路髒污判定,A級乾淨比例為28%,B級普通比例為72%。
中文關鍵字 營建工程、污染削減、網路申報

基本資訊

專案計畫編號 經費年度 109 計畫經費 7310 千元
專案開始日期 2020/01/01 專案結束日期 2020/12/31 專案主持人 陳意淳
主辦單位 宜蘭縣政府環境保護局 承辦人 吳國華 執行單位 康廷工程顧問企業有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 109年度宜蘭縣營建工程污染管制及空污費徵收計畫(定稿本).pdf 22MB

109 Yilan County Construction Project Pollution Control and Air Pollution Fee Collection Plan

英文摘要 The plan promotes the active implementation of pollution prevention work on construction sites using graded inspections, counseling large-scale construction sites, and project control areas. During the planning period, a total of 4,293 inspections were completed, and the average inspection emissions reached 91.3%. The compliance rate of the construction site management methods was checked. Is 82%. (1) During the execution of the plan, 2,758 air pollution fee declarations were processed for construction projects, and the collected amount was NT$54,840,344. In terms of air pollution fee audit reports, a total of 63 overdue declarations were submitted, and the total collection of late fees and interest NT$13,240, 364 cases of first action work, total collection of late fees, and interest of NT$322,340, all of which have been called for payment, and a total of 47 cases of undeclared projects have been reported, of which 29 cases have been completed to declare and pay for air pollution from construction projects. The collected amount is 78,033 yuan, and 19 cases have not been submitted to the bureau. During the period, the unsettled reminder rate was 77%. (2) During the plan's execution, 4,293 projects were inspected and 153 inspections were assisted. The average inspection emission ratio was 91.3%, of which 3,302 points accounted for 75.2%, and minor defects (4 points in violation of the management regulations) Above, below 8 points) 764 times accounted for 17.4%, and serious defects (violating the management measures above 10 points) 326 times accounted for 7.4%. (3) 2,578 inspections were carried out, and the newly declared inspection and management rate was 75%. Among them, 1,115 projects were managed by the first-level project, and 806 were inspected, and the inspection rate was 72%. The second-level project was managed by 2,119 and 1,254 were inspected. The inspection rate by the management method was 59%. The inspection rate was 59% for the first and second levels. The inspection rate of construction site management measures was 64%. In addition, the compliance rate of the overall construction site management measures was 82%, of which the first-level construction site was 82%, and the second-level construction site was 82%. (4) During the period, a total of 69 construction sites were coached. With the help of the counseling work, a total of 37 construction sites were counseled and improved to zero in the current situation, effectively improving compliance with laws and regulations. To strengthen pollution reduction in sensitive areas, three project control zones were established, namely Toucheng Wushi Port Project Control Zone, a total of 10 sites were managed, and the number of regulatory compliance sites was 5, the regulatory compliance rate was 50%, and the pollution reduction rate was 57.1%. ; The Jiaoxi Hot Spring Tourism Project Control Zone has a total of 11 sites under management, with 6 regulatory compliance sites, a compliance rate of 55%, and a pollution reduction rate of 55.2%; Lize Project Control Zone has a total of 19 regulatory sites, and the number of regulatory compliance sites In 9 locations, the compliance rate was 47%, and the pollution reduction rate was 52.3%. (5) During the project period, a total of 29 stalkings were conducted. After stalking and coaching the road cleaning, the dirt level of the road has been upgraded to one level or more. The dredging engineering transport vehicle body is pulled down to cover a 15 cm photography track. The number of photography vehicles totals 236, of which 13 are empty, while the number of gravel vehicles that meet the construction engineering management regulations is 219, and there are 4 non-compliant vehicles. Second, the coverage rate of photography sand and gravel vehicles was 98%. (6) The utilization rate of online declarations reached 75%; a total of 2,325 completed settlement declarations, 1,718 were used for online declarations, and the utilization rate of online declarations reached 74%. (7) 333 construction waste inspections were performed, 279 construction sites were inspected cumulatively, 62 construction sites were inspected with defects on-site, and 60 improvements were completed after counseling. (8) A total of 116 road adoptions were implemented on construction sites, and a total of 44 new ones were adopted. The cumulative total mileage of street cleaning was 22,585 kilometers. It is estimated that TSP pollution reduction by 311.7 metric tons and PM10 by 58.7 metric tons. According to the monthly inspection of road pollution, the clean ratio of A-grade is 28%, and the ordinary ratio of B-grade is 72%.
英文關鍵字 construction, pollution reduction, online declarations