英文摘要 |
The plan promotes the active implementation of pollution prevention work on construction sites using graded inspections, counseling large-scale construction sites, and project control areas. During the planning period, a total of 4,293 inspections were completed, and the average inspection emissions reached 91.3%. The compliance rate of the construction site management methods was checked. Is 82%. (1) During the execution of the plan, 2,758 air pollution fee declarations were processed for construction projects, and the collected amount was NT$54,840,344. In terms of air pollution fee audit reports, a total of 63 overdue declarations were submitted, and the total collection of late fees and interest NT$13,240, 364 cases of first action work, total collection of late fees, and interest of NT$322,340, all of which have been called for payment, and a total of 47 cases of undeclared projects have been reported, of which 29 cases have been completed to declare and pay for air pollution from construction projects. The collected amount is 78,033 yuan, and 19 cases have not been submitted to the bureau. During the period, the unsettled reminder rate was 77%. (2) During the plan's execution, 4,293 projects were inspected and 153 inspections were assisted. The average inspection emission ratio was 91.3%, of which 3,302 points accounted for 75.2%, and minor defects (4 points in violation of the management regulations) Above, below 8 points) 764 times accounted for 17.4%, and serious defects (violating the management measures above 10 points) 326 times accounted for 7.4%. (3) 2,578 inspections were carried out, and the newly declared inspection and management rate was 75%. Among them, 1,115 projects were managed by the first-level project, and 806 were inspected, and the inspection rate was 72%. The second-level project was managed by 2,119 and 1,254 were inspected. The inspection rate by the management method was 59%. The inspection rate was 59% for the first and second levels. The inspection rate of construction site management measures was 64%. In addition, the compliance rate of the overall construction site management measures was 82%, of which the first-level construction site was 82%, and the second-level construction site was 82%. (4) During the period, a total of 69 construction sites were coached. With the help of the counseling work, a total of 37 construction sites were counseled and improved to zero in the current situation, effectively improving compliance with laws and regulations. To strengthen pollution reduction in sensitive areas, three project control zones were established, namely Toucheng Wushi Port Project Control Zone, a total of 10 sites were managed, and the number of regulatory compliance sites was 5, the regulatory compliance rate was 50%, and the pollution reduction rate was 57.1%. ; The Jiaoxi Hot Spring Tourism Project Control Zone has a total of 11 sites under management, with 6 regulatory compliance sites, a compliance rate of 55%, and a pollution reduction rate of 55.2%; Lize Project Control Zone has a total of 19 regulatory sites, and the number of regulatory compliance sites In 9 locations, the compliance rate was 47%, and the pollution reduction rate was 52.3%. (5) During the project period, a total of 29 stalkings were conducted. After stalking and coaching the road cleaning, the dirt level of the road has been upgraded to one level or more. The dredging engineering transport vehicle body is pulled down to cover a 15 cm photography track. The number of photography vehicles totals 236, of which 13 are empty, while the number of gravel vehicles that meet the construction engineering management regulations is 219, and there are 4 non-compliant vehicles. Second, the coverage rate of photography sand and gravel vehicles was 98%. (6) The utilization rate of online declarations reached 75%; a total of 2,325 completed settlement declarations, 1,718 were used for online declarations, and the utilization rate of online declarations reached 74%. (7) 333 construction waste inspections were performed, 279 construction sites were inspected cumulatively, 62 construction sites were inspected with defects on-site, and 60 improvements were completed after counseling. (8) A total of 116 road adoptions were implemented on construction sites, and a total of 44 new ones were adopted. The cumulative total mileage of street cleaning was 22,585 kilometers. It is estimated that TSP pollution reduction by 311.7 metric tons and PM10 by 58.7 metric tons. According to the monthly inspection of road pollution, the clean ratio of A-grade is 28%, and the ordinary ratio of B-grade is 72%.
|