環境資源報告成果查詢系統

109 年度金門縣逸散污染源稽查管制計畫

中文摘要 開工申報607件,申報空污費20,525,697元;完工結算中退費金額182,072元、補繳金額為3,452,759元;逾期加徵案件61件、加徵金額24,802元。而相關案件經合併加總計算後的總淨收金額為23,821,186元。施工中工地共計有1,113處,其所產生的PM10原始排放量總計為388.72噸,而本計畫共完成3,872件次之巡查,納管其中1,059處(工地納管率為95.14%),在經本計畫管制後,管理辦法符合比例為81.2%,抑制污染PM10削減量為228.468噸(污染削減率為58.77%)。在裸露地管制方面,本計畫人員現地清查之裸露地共列管裸露地182處,總列管面積為61,426 m2。已改善有31處,改善面積為44,383m2。在露天燃燒管制方面,共計稽巡查123件露天燃燒,有發現露天燃燒情形,立即協請進行撲滅,並加強宣導勿露天燃燒觀念及危害;經換算,TSP之抑制量為229公斤、PM10之抑制量為188公斤。並辦理4場次露天燃燒宣導說明會,懸掛20條宣導紅布條於交通要道或村里明顯處,提升能見度及效果。
中文關鍵字 營建工地、露天燃燒管制

基本資訊

專案計畫編號 kepb109-03 經費年度 109 計畫經費 5000 千元
專案開始日期 2020/02/01 專案結束日期 2020/12/31 專案主持人 許浩洋
主辦單位 金門縣環境保護局 承辦人 林偉倫 執行單位 立境環境科技股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 109年度金門縣逸散污染源稽查管制計畫-摘要(詳細版).pdf 0MB

2020 Kinmen County Fugitive pollution source Control Plan

英文摘要 There were 607 applications declared, and air pollution charges of TWD 20,525,697 were reported. In the settlement of completion, the refund amount was TWD 182,072, and the additional payment was TWD 3,452,759. There were 61 overdue cases and TWD 24,802. The total net income of the related cases after combined calculation was 23,821,186 yuan. There are a total of 1,113 construction sites under construction, and the original PM10 emissions generated by them total 590.48 tons. The plan has completed a total of 3,872 inspections, of which 1,059 are managed (the site management rate is 95.14%). After the control of the plan, the compliance ratio of the management measures was 81.2%, and the PM10 reduction by pollution control was 228.468 tons (the pollution reduction rate was 58.77%). In terms of bare land control, 182 bare grounds were located in the bare grounds inspected by the planners, with a total area of ​​61,426 m2. 31 improvements have been made, and the improvement area is 44,383m2. In the field of open-burning control, a total of 123 open-burnings were inspected. If open-burning was found, we immediately asked for extinguishment and strengthened the publicity of the not-open-burning concept and harm. After conversion, the suppression amount of TSP was 229 kg and The suppression amount is 188 kg. It also handled 7 open-air burning briefing sessions, and 20 publicity red cloth strips were hung on the main traffic roads or in obvious locations in the village to improve visibility and effectiveness.
英文關鍵字 Construction site,control operations of open burning