環境資源報告成果查詢系統

109年度「嘉義縣營建工地及逸散污染管制計畫」

中文摘要 本計畫統計執行期程自109年1月1日起至109年12月31日止,整體工作執行摘要說明如下:「109年度嘉義縣營建工地及逸散污染管制計畫」係執行嘉義縣轄內之營建工程空氣污染防制費徵收、營建工地管制、管理辦法查核、裸露地查核及改善、大型工地空拍查核、施工機具油品調查及檢驗、逸散性粒狀污染物運輸車輛管制、宣導及行政配合作業及環保署考評內容執行等內容。 計畫執行管制面乃依據「空氣污染防制費收費辦法」、「營建工程空氣污染防制設施管理辦法」及「固定污染源逸散性粒狀污染物空氣污染防制設施管理辦法」規定辦理。109年度總計申報3,040件工程,完成6,306處次工地巡查,採用UAV裸露地清查,施工機具油品檢驗24件次含硫量,推動稻草蓆鋪設33.3645公頃,查核237輛次逸散性粒狀污染物運輸車輛,管理辦法符合率90%,TSP削減率69.54%,並適時提出問題解決方案與建議供環保局參酌,以提升本縣營建工程污染管制之良好管制成效。
中文關鍵字 營建工程、逸散管制

基本資訊

專案計畫編號 經費年度 109 計畫經費 9560 千元
專案開始日期 2020/01/01 專案結束日期 2020/12/31 專案主持人 何宗安
主辦單位 嘉義縣環境保護局 承辦人 張瓊敏 執行單位 新紀工程顧問有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 109年嘉義縣營建工地及逸散污染管制計畫期末定稿.pdf 84MB

The 2020 Chiayi County Construction Site and Fugitive Pollution Control Project

英文摘要 The 2020 Chiayi County Construction Site and Fugitive Pollution Control Project aimed to implement the collection of air pollution prevention fees for construction projects in Chiayi County, control of construction sites, verification of management regulations, inspection and improvement of bare land, inspection of large construction sites via aerial photography, survey and inspection of the fuel of construction equipment, control of transport vehicles generating fugitive particulate pollutants, advocacy and administrative compliance, and improvement of items assessed by the Environmental Protection Administration (EPA). The project was implemented based on the Air Pollution Control Fee Collection Regulations, Management Regulations for Construction Project Air Pollution Control Facilities, and Management Regulations for Facilities to Control Fugitive Dust Air Pollution from Stationary Pollution Sources. In 2020, a total of 3,040 construction projects were declared, and 6,306 construction inspections were completed. The examination of bare land was carried out with unmanned aerial vehicles (UAV). Twenty-four cases of sulfur testing were conducted regarding the fuel of construction equipment. Straw blankets were laid to cover 33.3645 hectares of bare land. Two hundred and thirty-seven vehicles were inspected for fugitive particulate pollutants. The regulatory compliance rate was 90%, and the reduction rate of total suspended particles (TSP) was 69.54%. Solutions and suggestions were proposed accordingly for EPA’s reference to improve the efficiency of controlling construction pollution in Chiayi County.
英文關鍵字 Construction Pollution, bare land