英文摘要 |
1.The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution.
2.To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 60.5 %. The rate of the emission inspection and governed inspection are 77.6 %.
3.The declarations of air pollution fee for construction are 4,056 cases and air pollution fees amounted to 94,609,321 N.T. dollars; the number of air pollution fees declarations of this year is highest in three years.
Governed construction sites are 7,118 places and the amount of inspection for building sites are 9,408 times; sites information collected during routine inspection was created files on schedule;4 construction site pollution consultations were held. Constructors (95 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 121,915.64 kilometers, and PM10 volume was reduced 316.96 tons.
4. Conducted a general inspection on construction machinery used in Yunlin County’s construction and engineering projects. Totally 276 vehicles and most of them are excavator. 7. Implemented opacity detection on machinery vehicles for 106 times. 77 of the tested targets complied with the 1.0m-1 standard and 69 of them received the self-management label; 29 of the tested targets were above the 1.0m-1 standard. With respect to those that are above the 1.0m-1 standard, the owners thereof have been guided to implement related maintenance works (ex., to adjust the fuel control system, engine system, injection pump and injector) and to regularly track the maintenance status of their vehicles.
Implemented “Reinforced Public Engineering Air Pollution and Noise Controls and Management” and conducted an inspection on 61 public engineering projects within the jurisdiction to ensure their compliance with “Public Engineering Air Pollution and Noise Controls and Management”.
5.Conducted noise detection on 82 construction sites. Among them, 24 sites were inspected due to reported noise and the other 58 sites were carrying out public engineering projects. The detection results indicate that the above sites comply with regulatory standards.
|