This project has been executed since Jan.,2021, including motor
2
vehicle noise control, traffic noise pollution inspection o n public sentiment
(for railroad and highway), non-ionizing radiation (base station and electric
facilities), environmental noise check, airport noise control center &
monitoring station check, and instrument verification and calibration, etc.
The plan was implemented from Jan. 1st, to Dec. 15th, 2021, and completed
all work processes in accordance with the planning schedule. The contract
was signed as amount of NT$ 3.90 million and 6 thousand. The manpower
is arranged according to the contract requirement, as of project director,
project manager, engineers and on-site representative.
Key accomplishments are including, a total of 43 prenotice-to-check
sessions. A total of 29 noise analysis and monitoring on civic complaint
hotspots.Sorts of traffic noise monitoring cases were executed, including,
total of 10 monitoring cases on express highway, highway, and roads; total
of 2 executed on railways. A total of 40 measurements on non-ionizing
radiation tests. A total of 4 environmental noise inspections was
performed.Checks on noise control center and monitoring station of Xinshe
Airport and Ching-Chuan-Kang Air Force Base were completed in the 2nd
quarter and 3rd quarter, 2021. All performing instruments are verified and
calibrated within the project period.
|