The information of the Construction site, Supervision, Pollution reduction had been gathered and analyzed during May 2, 2022 to May1,2023. Based on the analysis results, We developed the strategies and implemented completely. Achievement as below.
1.9,755 cases of air pollution control fee, 4,863 cases of construction declare, 4,892 cases of construction finished, 176 cases of constructor changed. The total amount is NTD $ 157,341,734. Online declaration rate is 96.37%.
2.8,968 times of inspection during the plan period, 91.59% signature rate, 71.05% management and 99.81% coincidence rate.
3.20 times of equipment exhaust testing during the plan period, all of it are up to the standard.
4.30 times of aerial photography during the plan period, 3 of it are regional development projects.
5.5,407.6km road investigation length during the plan period, level A account for 85.84%, level B account for 14.16%.
|
英文關鍵字 |
Construction air pollution fee, Online declaration, Construction site pollution control, Road investigation, equipment exhaust testing, Micro sensors, CCTV, AI dust recognition
|