英文摘要 |
From January to December 2020, this plan processed a total of 515 construction air pollution fee declarations in the county, with construction air pollution fees of 11,318,561 yuan declared. The number and amount of declarations were highest in the "regional development project category", accounting for 43%. %; among the towns, Jincheng Town had the largest number of declarations with 136, and Jinhu Town had the highest amount of RMB 5,955,245. During the statistical period, a total of 531 cases of completion settlement were handled, with the amount of back payment amounting to RMB 4,783,676; there were a total of 33 cases of declaration of late payment fines or interest, with a total amount of late payment fines and interest of RMB 15,027. During the statistical period, the net amount collected from construction air pollution fees was 15,789,804 yuan.
As of the end of December in 2012, there were a total of 1,074 construction sites under construction. This plan has completed the inspection of 1,040 construction sites. The construction site management rate was 96.83%, and a total of 3,900 construction site inspections were completed.
The average proportion of construction management methods that comply with regulations is 75.75%, and the average of first-level projects at each level is 86.46%. Among the towns, Jincheng Town has the highest average of 83.95%. After verification and control, TSP pollution reduction was 318.28 tons, with an average pollution reduction rate of 62.03%. Among all levels, the second-level project has a higher pollution reduction rate of 63.54%. Among all project categories, the SRC project has the highest pollution reduction rate of 71.64%; among towns, Jinhu Town has the highest pollution reduction rate of 65.45%.
Due to the revision of the construction project management office in 2011, the construction paperless inspection system has been indirectly required to be upgraded and updated in line with the construction management office content. As of the end of October, the paperless inspection system design has completed the preliminary planning structure and is expected to present the module content. The first version was confirmed in June, and the adjustment mode was entered based on regional usage inertia. The technology transfer was completed in October and was officially put into use in November.
This plan has also completed 3 pollution reduction consultations for large-scale construction sites in accordance with the revised content of the management office. The large-scale construction areas (Taihu camp area turnkey project) reported this year will be used for pollution reduction consultations. In addition to on-site inspections to control the construction of the construction sites, In addition to the operation status, the deficiencies in the prevention and control facilities were required to be improved, and the serious deficiencies were reduced to minor deficiencies, which greatly reduced the pollution emissions of the construction projects and improved the pollution prevention concepts of the owners and construction contractors. The other two cases were not completed this year. For other large-scale industrial areas, we have selected campus reconstruction projects that are likely to attract public attention for negotiation. We remind manufacturers that they must put in place prevention facilities and pay attention to the impact of construction noise on school children.
In order to understand the effectiveness of street cleaning in the county and to assist the Ministry of Environment in investigating the dust load on the county's roads and the pollution emissions from vehicle vehicle paths, this project has also completed 2 soil sampling tests, with a total of B before the completion of cleaning. There are 11 Class A roads and 1 Class C road. After cleaning, there are 8 Class A roads and 4 Class B roads.
In terms of bare land control, a total of 41 bare lands were listed in the on-site inventory, including 40 newly completed bare lands this year, totaling 19,075 m2, the completed improvement area is 16,020 m2, and the exposed land area that has not yet been fully improved is 3,055 m2 , is a general exposed land area of about 24,000 m2, and the completed improvement area is 22,800 m2. The improvement will continue to be tracked in the future.
In terms of open burning control, a total of 81 open burning cases were inspected, and 66 of them were found. We immediately requested assistance to put out the fires, and strengthened the promotion of the concept and hazards of not burning in the open. After conversion, the TSP suppression amount is 12.10 kg, The inhibition capacity of PM10 is 30.52 kg, the inhibition capacity of SOx is 1.80 kg, the inhibition capacity of NOx is 11.15 kg, the inhibition capacity of CO is 164.91 kg, the inhibition capacity of THC is 79.55 kg, and the inhibition capacity of NMHC is 55.75 kg.
|