臺灣地區資源垃圾分選廠(場)興建計畫可行性評估調查及研究--垃圾進焚化廠前之垃圾分選
中文摘要 | 計畫內容包含對台灣地區一般廢棄物屬性、物理組成細項分析確立分選回收對象,進行分選廠之處理技術、規模、人力需求、回收效益等評估,並做分選廠之興建營運及監督模式與經濟效益評估。 為達成提高整體資源回收率,落實垃圾減量、資源回收政策並與現有各縣市政府環境保護局推行之資源回收工作相輔相成之成效,若能於九十六年底興建三座垃圾資源回收分選示範廠,垃圾分選總處理量每日約1,500公噸,每日回收資源物質約300公噸,經濟效益至少包含資源回收所得、節省垃圾處理費用、延長垃圾資源回收(焚化)廠及灰渣掩埋場使用年限等。 | ||
---|---|---|---|
中文關鍵字 | 臺灣地區資源垃圾分選廠(場)興建計畫可行性評估調查及研究 |
基本資訊
專案計畫編號 | EPA-92-y101-02-103 | 經費年度 | 092 | 計畫經費 | 3150 千元 |
---|---|---|---|---|---|
專案開始日期 | 2003/09/10 | 專案結束日期 | 2004/12/31 | 專案主持人 | 陳嘉煒 |
主辦單位 | 環境督察總隊 | 承辦人 | 執行單位 | 慧能工程股份有限公司 |
成果下載
類型 | 檔名 | 檔案大小 | 說明 |
---|---|---|---|
期末報告 | 0000068942.zip | 11MB | [期末報告]公開完整版 |
The feasibility study of municipal refuse resource sorting and recycling plant
英文摘要 | The Environment Protection Administration of Executive Yuan intend to reduce the processing pressure of municipal refuse incineration plant and landfill and improve the refuse cleaning and processing mechanism of local government and also assist to reaching the minimization target of refuse; and cooperate with recycle and reuse mechanism to improve the local government refuse processing system function and efficiency. Therefore EPA decide to introduce the feasibility study and research of refuse sorting and recycling plant construction program— sorting and recycling before refuse entering to incineration plant. The execution period of the feasibility study and research is from Sep. 10, 2003 to Dec, 31, 2003 and project expense is NT$3,150,000. The objective of project is to evaluate the feasibility study of municipal refuse sorting and recycling plant construction. The project content include physical and chemical analysis of municipal refuses composition to certify recyclable materials, assessment of technology, capacity, manpower requirement and recovery benefit and evaluation of operation and maintenance, supervising method and economic efficiency for sorting and recycling plants. In order to promote the total resource recovery efficiency and consolidate the policy of refuse reduction and resource recovery and to cope with the achievement of individual Environmental Protection Bureau of County Governments for promoting resource recovery, there are three refuse resource sorting and recycling plants to be constructed for demonstration by the end of 2007. The total treatment capacity of those plants is 1,500 tons/day and the recyclable resource capacity recovered is approx. 300 tons/day. The economic efficiency include at least the income of recyclable material, saving of refuse treatment cost, life extension of incineration plants and landfill sites, etc. | ||
---|---|---|---|
英文關鍵字 | The,feasibility,study,of,refuse,resource,recycling,plant |