Total income for 5858 declaration is 166,624,845 NT dollar.Amount for cases of “Refund of Air Pollution” is 3,212,985 NT dollars. The ration of average refund is 20.09%. This year, We have patrol the 4644 construction site according to the inspection control of the construction.
To command the resource of particle pollution, we have controlled and counseled the reduction of high pollution construction.The county’s TSP containments is 91.01%-93.56%, average 92.53%; reduction of pollution is 38.61%-55.87%, average 45.29%. The total amount of pollution reduction is 4635.46 ton TSP.
This project used all kinds of media to publicize, includes the handbook, ads, and CD; also, we issued the news release to inform the construction sites about the regulation and pollution control. We also hold 3 publicize conference to enhance construction sites’ pollution protection facilities management. After publicizing, we cooperate with Chia-Nan Irrigation Association and Directorate General of Highway Fifth Maintains Office to process the execution of pollution protection facilities. After, Chia-Nan Irrigation Association substituted the facility, and Department follow-up the examination approval.
In the entire construction site, they need to build the pollution protection facilities which include fens, dust-proof net, soil-pile regulation, uncover surface, and car washing facilities at entrance. For the construction site that do the excellent job on the facilities, we will award them as the role model.
To those high polluted construction sites, we have completed 40 TSP examination. Two of the construction site that violated the standard of the Department, the fine is 6 hundred thousand NT dollars. Near to the high pollution construction site, we process 5 dust-falls inspection. The result of the inspection is light pollution; the result can be reference of construction sites’ control.
The result of public questionnaires show the public satisfaction is about 90%.
|