英文摘要 |
This plan must complete eight projects. This plan was investigation of fugitive particulate from exposed surfaces in Taichung. Investigate the scope containment school, beach areas and general exposed surfaces. The plan were completes 56 inquisitions of schools, 20 inquisitions of exposed surfaces and 3 inquisitions of beach areas. Because between each work has its connection, therefore actually carries out for many work merge and fills in the same data sheet. The report correspondence number of pages and the complete rate was showed as abstract table. In addition, each work and related document also recorded ten discs.
|