(一)Stress to inspect every construction sites air pollution’s control
1.From April 1, 2003 to December 31, we control 1931 construction sites,and total inspection count is 4820(The purpose is 4000, and the progress rate is 120.5%)
2.Every building engineer analysis
3.The statistics of controlling with each administration section
4.Inspection frequency
5.Protection ways to reduce in construction sites
6.Punish cases statistics
7.Building construction air pollution fee inspection
(二)Renew the basic data of building construction and set up the data bank.
1.Using computer data bank to measure the real pollution emission and the rate of reducing.
2.Inspect the data bank’s quality and check the writing data is the same as the information bank.
(三)Announce activities
1.Finish editing and copy the announce documents.
2.Held two conferences on July 1, 2003 and September 3.
3. Held two conferences on August 18, 2003 and December 24 in creative school.
4. Held two conferences about construction pollution promotion on September 18, 2003 and October 24.
5.Renew the website and provide the information of construction pollution control.
(四)Inspection TSP
Finish 7 construction places and 21 times of TSP inspection and analysis.
(五)Building construction’s guidance and assistance
1.From May to give 20 constructions lists to Environment Protection Bureau.
2.The inspection job is doing during October to November.
3.On December 24, 2003 to praise in public place.
(六)Building construction road adopted
To the end of December 2003, we complete the length for adopting to sweep for 33828 km whole year.
(七)Help to get the construction air pollution protection fund.
From 2003 January to December 31, we get the fund for NT: 114434775.
(八)Survey
1.We get 1021 useful survey。
(九)Other renew items
1.Huge public construction control case for special effort.
2.Deseart dust not on the floor practicable
3.High pollution date of change of building construction.
(十).Environment Protection grades
This project on 2003 Self-criticism gets 100.
|