英文摘要 |
This plan has completed 215 renewal and maintenance work, after including 6 to shut down and rejects,checks 209.This city source of pollution withdrawal change is Par reduces 121.54 metric ton/years after the renewal and the expansion work,SOx reduces 57.28 metric ton/years,NOx reduces 57.15 metric ton/years,VOC reduces 60.95 metric ton/years,CO reduces 5.19 metric ton/years.
In the permission application work aspect,this city 1st conforms to the announcement condition to 7 batch,must propose the applicant altogether has 71 system regulations,all handed in the application;Counts application case each kind of permit, distinguishes 1 to establish,2 establishes the change,2 operates the permission application,9 operates the permission change,3 permitted extends, trades sends permit 3,application total 20 system regulation;1 establishment,1 operation permission application,1 operated the permission change,still in the examination,other then has completed the examination to send in the card.
The permission issues after due investigation following checks the work,according to the permission withdrawal,the system regulation respective announcement approves the second-rate condition,sets up checks the order,the idea has completed checking of the 42 system regulation,in which after checks the symbol not to be supposed to handle the change or the change has 7,but 4 completed the change application,in 1 retire and make amends,still has 2 not to hand in the application slowly because of place half work suspension condition,will supervise asks the entrepreneur to propose the change or the change application before the year's end.
This plan altogether has 44 public and private places to raise the newspaper examination result report,respectively examines 4,the permission be the operation permission reported regularly 23,after, announced 1,2 batch of regular inspections 16,the punishment improve report 1.The forecited each kind of examination report,in the examination process the discovery has lacks or not the reason,requests to supplement and correct, completes 44th the declaration results examination to conform to the laws and regulations standard,has completed the checking.
In 2005,this city 1st season to the 3rd season air pollution guards against system to levy 294,029 Yuan,this plan completes 9 time to urge to pay and submit,12 times checks,at present this year 3rd season air pollution guards against system spends has completed the declaration.
Is checking does an inspection to control the work aspect, altogether carries out 645 times checks (patrols) looks up, examines including state counts 191,examines 172 generally,as well as coordinates each law policy to do an inspection idea 282.
In the data processing and the computer records management aspect,altogether completes 1134 copy clerk materials to construct the files,1376 computers construct the files. Discharges the total quantity by way of the computer pollution to push estimates, at present this city row tube Par is 102.62 metric ton/years,SOx 54.69 metric ton/years,NOx 290.59 metric ton/years,VOCs is 287.92 metric ton/years,CO 176.85 metric ton/years.
|