「高雄縣二仁溪水污染源稽查管制暨河川巡守執行計畫」及「二仁溪下游環境改善及維護計畫」

中文摘要 本團隊針對二仁溪流域所列管之270家事業執行稽查,期間共完成245家次相關稽查,若依稽查行業別分佈統計以畜牧業(一)的稽查家次最高,共完成183家次,佔總稽查數的75%,其次為金屬表面處理業及電鍍業,共完成13家次,佔總稽查數的5%,由於畜牧業(一)本身列管家數較多,因此相對之下有較高的稽查數,在245件稽查案中以「未符合放流水標準」不符規定者最高均為10件,佔總違規件數的83%,其次是繞流排放,共2件,佔總違規件數的17%。於本計畫執行期間共完成143件列管事業單位放流水採樣檢測,其中有10家次無法符合放流水標準,查獲2家業者有偷排行為,目前已委託舢筏協會進行河面垃圾之清除,並進行攔污網的維護及不定期之河面巡查工作,從計劃開始截至9月中以清除1.8噸之垃圾,並不定期巡查河面28次。
中文關鍵字

基本資訊

專案計畫編號 經費年度 097 計畫經費 4570 千元
專案開始日期 2008/05/30 專案結束日期 2009/05/29 專案主持人 廖君庸
主辦單位 高雄市政府環境保護局 承辦人 執行單位 技佳工程顧問有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 高雄縣二仁溪水污染源稽查管制暨河川巡守執行計畫及二仁溪下游環境改善及維護計畫.rar 18MB

"Kaohsiung County, Erzen sources of water pollution inspectors Control and river patrol implementation plan" and "Er-zen downstream environmental improvement and maintenance plan"

英文摘要 The team for the Er-zen river basin management of the 270 listed in the cause of implementation of the audit, completed a total of 245 times during the relevant audit, inspection industry, as contemplated by the distribution of other statistics to animal husbandry (1) home inspectors meeting the highest completed a total of 183 times , accounting for 75% of the total number of inspectors, followed by metal surface treatment industry and the electroplating industry, completed a total of 13 times, accounting for 5% of the total number of inspectors, as animal husbandry (1) itself out in a few more housekeeping, so contrast have a higher number of inspectors, 245 inspectors in the case of "fail to comply with effluent standards" are inconsistent with the provisions of a maximum 10, representing 83% of the number of illegal items, followed by the bypass flow discharge, a total of 2, accounting for the total number of non-compliance cases 17%. This project were completed during the execution of 143 effluent samples test tube and institutions, including 10 times can not meet water standards, and seized two family business who have waste-water treatment practices are currently conducted by the Federation has commissioned a raft river sampan refuse removal , and make intercept sewage network maintenance and unscheduled inspections of the river, from the plans to start at 9 months to clear the 1.8 tons of garbage, and occasional inspections river 28 times.