Summary
1. This plan from 97 years on January 17 execution to 98 years up to January 16, Various sub-items quantification work finish rate like table 1.
Table 1 Work finish rate
Work project Target Completes Finish rate
(%)
Training meeting 6 times 6 times 100
Patrol length 60,000 Km 519,112 Km 100
Bulletin sign establishment 120 points 129 points 100
Remove waster point 40 points 52 points 100
Public toilet grading 24,528 quantities 27,058 quantities 100
Waste water examination 1,800 quantities 2,637 quantities 100
10 times 10 times 100
Member grading - 12 times -
Achievement report - 12 times -
Statistical period: 97 years from January 17 to 98 years on January 16
2. River protection team tenable and in-service training.
This plan on January 17 plans the execution initial period in 97 years, will extend employment on “96 annual plans” 45 river protection team member, the member chooses taking the post of by this county populace, and is different according to various basins and the member in the villages and towns region, plans 11 squads, and recommends an artificial group commander.
To promote specialty of accomplishment continually the making an inspection tour personnel, this work team in every 2 month convention work self-criticism and in-service training curriculum, and Yu Huihou carries on measures tests.
3. The river protection team members inspect.
The plan on January 17 carries out in 97 years to 98 years on January 16 has completed 12 internal inspections. The member inspection result, the first-class has 2, the class A is 40 equally ,the class B is 2 equally.
4. Patrol achievement
This plan execution until now, six big basin repayment case reorganized as shown in Table 2, 97 years from January 17 to 98 years on January 16 pollution of number of articles repayment, the open burning doing an inspection number of articles reaches 941, the reject piles sets patrols investigates 2,389, the water pollution repayment number of articles reaches 5,564, the stink doing an inspection case, altogether repays 1,584.
Table 2. Six big basin patrol achievement
Work project Bajhang Jishuei Jiangjyun Zengwun Yanshuei Erren total
total The alfresco to burn’s 156 144 158 151 150 182 941
Water pollurtion 98 69 269 1507 496 3125 5564
Waste Abandoning 345 287 519 619 462 157 2389
Stink 332 129 123 491 257 252 1584
Reduction the alfresco
to burn’s (m3) 42135 100 2872 971 389 5776 52242
Waste Abandoning quantities (m3) 8122 2356 9954 1686 11017 20020 53154
Patrol length(Km) 52743 39174 84377 138275 78464 126079 519112
Bulletin sign establishment 20 13 25 20 30 21 129
Statistical period: 97 years from January 17 to 98 years on January 16
5.The air pollution reduces the achievement.
This plan pushes estimates each item of air pollutant improvement quantity as shown in Table 3.
Table 3 air pollutant improvement quantity
Pollutant
Project improvement quantity
TSP PM10 SOX NOX CO THC NMHC Unit
Straw 199 88 2 73 1800 148 66 kg
Solid waste 672 239 42 252 3528 1806 1260 kg
Metro waste 128 46 8 48 672 344 240 kg
Plant 26 26 0 6 210 36 29 kg
total 1025 399 52 379 6210 2334 1595 kg
|