英文摘要 |
The project was divided into the emphasis on four main subjects: (1) The review of existing regulations and the relevant management measures, (2) Integration of statistical information of each waste, (3) The application with innovative technologies, and (4) System function upgrade and maintenance.
In aspects with the review of existing regulations and the relevant management measures, this year the project has cooperated to complete two announced draft amendments, "Enterprises that should submit an industrial waste disposal plan for review" and "Enterprises that shall report the production, storage, clearance and disposal, reuse, export, import, or cross-boundary transport or transshipment of waste via online transmission"; and reviewed "the submission format, items, content and frequency for the reporting of the production, storage, clearance and disposal, reuse, export, import, or cross-boundary transport or transshipment of waste via online transmission"; also, finished in the planning for dry batteries and illegal waste output flow control mechanism, and the planning of 5 electronic permits.
In regards to integration of statistical information of each waste, completions include the framework review for the Industrial Waste Control Center Reporting System, which is divided into a 4-level framework: the general population, operating level, the management level and the decision-making level; also 53 statistical information reports of the industries were compiled, which has adjusted/added relevant columns and defined correlations according to their characteristics; furthermore, the OLAP functions were upgraded and the edition was revised. This is to mainly simplify the operating process and add different dimensions as purpose, which may even better meet with management needs.
For the application with innovative technologies, not only did the project combined the various wastes registration information and completed the Geography Information System prototype, but also introduced internet calling and the planning with a simple and convenient registration through voice phone. This provides vendors multiple consolation channels and registration methods.
In system function upgrade and maintenance, besides regular scheduled system maintenance, the project has also completed integration with the EMS system in 6 major functions and the merging of 2 authorized information items, has finished system connections with the Department of Air Quality Protection and noise control and the Department of Water Quality Protection, and added two E-management services and five main provisional demands to coordination with management policy implementation.
|