英文摘要 |
1. Impetus paper money to centralize and decrement process:
On February 28 stops up to 2009 altogether collects 305.79 metric tons, collects 144.6 metric tons with 2006 to compare the achievement to be extraordinary, but collects 294.04 metric tons with 2008 comparatively speaking to be many approximately 11 metric tons. By 2006~2008 collection tendency, demonstrated that the populace have gradually been able to accept the paper money centralism burning down work and are willing to coordinate the policy the impetus, reduces idea of the air pollutant emissions. According to the crematory against system equipment to processing of efficiency each kind of pollutant respectively be the suspended particulate 99.86%, sulfur oxide compound 88.35%, nitrogen oxide 33.3%, estimated that because may reduce the paper money open burning to have always suspended particulate matter 3.364 metric tons, the sulfur oxide compound 0.764 metric ton, the nitrogen oxide 0.856 metric ton.
In addition carries on 2007 to propose that the subsidy application establishment link earnest money stove following tracing use result checks the work, 2007 endorse temple oven to improve the counseling equipment total to have six temples. This year has six to propose the set up oven air pollutant control equipment, these temples were “Hao-Ten Temple” in Wu-Chi town ,“Cheng-Lan temple” in Ta-chia town, “Tai-An Temple” in Dong-Sih , “Long-Quan Temple” in Long-Jing township , “Bei-Ten Temple” in Tai-peng city , “Chauo-Tien Temple” in Sha-lu town, the all of the 4 temples have completed the establishment to work and to carry on the operation, carries on after this plan traces every quarter checks its operation situation to be good. And because the “Cheng-Lan temple” in Ta-chia town the application change design specification and postpones the equipment setup time regulation, because moreover the “Chauo-Tien Temple” in Sha-lu town the new temple construction progress of works to delay, the cause establishes temple oven to improve the counseling equipment progress backwardness to postpone the equipment setup time regulation, the above two temples apply to extend the until to 2009 at the end of April, stopped by 2009 at the end of February still did not have the discovered to subsidize the temple operation to check the unusual situation.
2. Exposed ground grasps and the improvement process:
This plan exposed carries on the check in view of the county, known arranges in order the tube 2007 exposed to complete review the total 27area, 12.6282 hectares, and this year grasps 9 to increase the exposed material altogether 4.0722 hectares exposed, exposed checks the area is always 16.7004 hectares.
In addition aims at 2007 already row tube 27 exposed, increases row tube 9 with 2008 exposed to carry on the counselling improvement work, total completes 5 2.6736 hectares exposed to improve. General exposed pollutes the emission factor computation according to the link bureau announcement, total may reduce the TSP:0.946 metric ton every month, the PM10:0.473 metric ton. And the part exposed adopts the afforestation to plant lives the way total area is 2.6736 hectares, the appraisal may reduce CO2 every year the approximately 61.493 metric tons.
3. The vegetation or the air quality purification area process:
This plan of June in 2008 and January in 2009 ,in environmental protection bureau 4F conference room to make 2 times of “Air quality purification area maintenance management“, and we invites EPA the technician Mrs. Sui and Dr. Tsai to teach in conferencein. The part of the air quality purification area scene inspection, we total completed 136 the air quality purification area investigation and the correlation inspection work until April in 2008.
We completes 9 times examination work which is to help budget for the green beautification to plants, the application subsidizes the green beautified total area are 10,613 square meters, after air-pollute fund committee permit, total subsidizes the amount of NTD 2,346,202.
|