英文摘要 |
The purpose of this project is to assist Bureau of PTEPB (Environmental Protection Ping Tung County) to administer the various programs scheme, the content and methodology itself. By means of the aforementioned implementation, we were able to review on what have been finished over time table and helped EPA to deal with AP (Air Pollution) agendas and minutes to boot, supervising the integration of the air quality improvement. Besides, the perspectives that the EPA are marching toward to better the Air Quality (AQ) should again be aligned with our schedule either long-term, mid-term, or short-term as a proposition in the control of the AQ in the future.
For the Air Quality inspection stations of EPA, the number of days which PT AQ reported poor accounts with respect to the data analysis from Jan to Dec, 2007, O3 and PM10 were accounted for 67 days and 17 days in Ping-tung, respectively, 84 days in total and 6 days less than last year. The Yan-jou Air Quality inspection station that was set by Pingtung County governor had 46 days were reported as poor, from Jan to Dec, 2007, the main pollutants including 42 days of O3 and 4 days of PM10, less than 18 days compared the same period from last year. When the AQ tend to poor, AQ feedbacks and related operations were implementing mechanism of forecast, notify, and feedback. The emails and messages were sent throughout all sites and feedback were supposed to be supervised.
There totally have 16 improving projects were held by Pingtung County governor which are following as brief. The main framework and demarches on the whole showed in figure. According to the EPA’s audit result, the average achievement point was 90.5 scores. We have contract with the Public Opinion Poll Studies Center of National Sun Yen-Sen University to survey the satisfaction among citizens above twenty-year old from 33 towns in Pingtung County about air pollution control. The result showed that 79.8% satisfied on tourism spot, 70.4% of gasoline VOCs recycle, 77.8% of random mobile bike inspection, 93.6% of mobile bike emission inspection service, 54.1% of construction sites, 57.5% of factories control and 68.2% of street cleaning etc. those could present the nearest surrounding to citizen and help us to improve the important parts.
We are in charge to executive of Air Quality Manage Project (AQMP). Studying the control strategy and assemble every subproject to archive their goals that including proposal amendment. For accommodating the future trend controlling strategy, we have issued the Air Quality control plan to EPA for censoring. The content included the reduction quantity and strategy, adjusting air pollution improving and maintenance goals and the emission control of stationary sources, mobile sources, and emission inventory update. According to analysis the intensity and variety of pollutant emission, the control strategy should focusing on stationary, gasoline station, cooking industry, mobile sources, construction sites, open burning, unpaved ground in the future. We have referenced both on the principle execution of EPA and air pollution control plan of Pingtung County governor to scheme on the Air Quality Improving project of Pingtung County in 2008. That included to 5 projects for air pollution fee foundation arrangement, and also handed out the subsidy request that including 11 projects for EPA.
|