水污染防治許可換發審查計(中區)(第三年)

中文摘要 本計畫辦理中區水污染防治許可換發審查計畫,負責包括中區桃園縣、新竹市、苗栗縣、台中縣、台中市、彰化縣、雲林縣以及金門縣等8個單位之水污染防治措施計畫或許可證(文件)之換發申請。主要工作重點為水污染防治措施計畫及許可證(文件)換發審查作業,並協助事業或污水下水道系統於98.12.31取得重新核准之相關許可證(文件)。同時彙整許可表格填寫常見之錯誤、許可申請文件與現場之差異性以及符合新修訂法規困難點等,做為後續修正水污法相關法規修訂之參考。 本年度受理1,058件許可申請文件,完成審查件數為1023件,未完成審查件數為35件。完成審查件數中新竹市23件、苗栗縣19件、彰化縣92件、台中市69件、台中縣122件、雲林縣430件、桃園縣268件。若以許可種類分析的話,則是以排放許可證完成審查案件數最多共820件(排放許可+簡易排放),其次分別為貯留許可證183件及水污染防治措施計畫20件。 累計三年許可換發成果,完成換證家數為5,344家(包括縣市自行審理),審查或補正中者22家,未申請換發者39家,總換發達成率為99.0%。就換發作業效益而言:在節省時間方面,業者方面因變更與換發許可證(文件)可一併辦理,因此每家業者可以節省58天水措申請時間,共節省7,888,000小時;政府機關因配合許可網路化,可節省許可申請案件輸入時間約8,000小時。節省費用方面,免證照費、審查費及技師簽證之措施,節省11,161萬元,配合多項措施一證管理,節省130萬元,許可申請e化,節省核發機關建檔人員薪資以及貯油場設置防溢堤減少之緊急應變行政成本3,885萬元,合計約省15,176萬元。綜上,執行本計畫不僅協助業者瞭解法令並配合法令執行水措、完成業者之許可換證,結合多項配套措施降低業者之不便與負擔,同時發揮省錢省時效益,再藉由地方環保局之現場稽查作業,更精確掌握水污染源排放情形,據以落實水污染源管理。
中文關鍵字 許可、換發、審查

基本資訊

專案計畫編號 EPA-98-G104-02-213B 經費年度 098 計畫經費 11000 千元
專案開始日期 2009/03/18 專案結束日期 2009/12/31 專案主持人 涂良君
主辦單位 水保處 承辦人 簡吟純 執行單位 台灣曼寧工程顧問股份有限公司

成果下載

類型 檔名 檔案大小 說明
期末報告 Microsoft Word - epa-換發期末報告98(全).pdf 21MB

Project of The Water Pollution Preventing and Controlling Permission Replacement Examination. (Central Area)

英文摘要 The project is to assist EPA in its replacement examination for the water pollution source preventing and controlling permission. Since May 28, 2007, this project has applied to 7 counties and cities for the permission replacement examination. According to the contact, there are 4,200 water pollution sources will be served to replace their permissions. Besides the replacement process preparation meeting focused these 7 counties and cities, there were 149 consulting meetings had achieved before December 31, 2007. At the same time, there are 3,140 water pollution sources had joined these consulting meetings and in consultation with our working group. Because of the livestock breeding consulting had been canceled in July, 2007, so that we have consulted additional water pollution sources since Oct. 2007. There were 14 additional consulting meeting had been achieved and there are 99 additional water pollution sources had obtained. In the permission replacement examination aspect, there were 3,257water pollution sources to submit permission applications and there were 1,005 water pollution sources had accepted site inspections. This project had finished examination operations for the permission applications of 3,180 water pollution sources and had already conducted 1,005 site inspections. This project also conducts paper inspections and site inspections for general engineering projects and improvement projects. In addition, this project has provided three special lines to give the water pollution source. This project has answered questions from the water pollution source in license agents since Oct., 2007.
英文關鍵字 Permission、Replacement、Examination