Taiwan's Nantou County is located in the center, near the sea are not the only counties, with the vigorous development of the tourism industry, the trend will be quite fast, the relative increase in the demand for housing and transportation, plus jurisdiction has LTK basin, two Wu River watershed, the relative also brings a wealth of debris in the county resources, construction, roads, pipelines and other miscellaneous projects to grow year by year, nearly three years the application of various types of construction works in construction sites are up more than 5,000 pieces highlights the importance of the county site pollution control.
Nantou County Government in accordance with the Environmental Protection Agency to look forward to pollution control construction projects, the project work plan of the four directions (air pollution fee collection, inspection control, project counseling, advocacy jobs) to promote the county air pollution fee levied on construction projects and pollution control operations , The main implementation results are summarized below.
First, air pollution fee levied
To implement the polluter pays for the purpose of assisting the county construction projects during the air pollution control fee plan. Statistics 102 in January to 102 in December 31 a total of 4,497 pieces of declaration of levy of $ 34,733,071, other types of engineering for 50.4% of the total amount of the new levy, followed by the total amount of 27.1% of road projects, the overall amount of the previous year a new collection of works an increase of approximately 27.8% over the same period; another 2,583 reminders should be handled at the time of completion clearing works; This year the Department of the convenient service towards the establishment of a customer-oriented service quality SOP, and strengthen education and training service personnel, hope cordial diverse pipeline and expedient services closer to the people, the authority to shape the image of quality and, through polls to understand the needs of the people and to analyze trends in satisfaction research, as the direction of the review for improvement. To enhance the construction project efficiency air pollution fee levied to deal with cases of this project, and actively cooperate with the EPA, "air pollution control fee for construction projects online reporting system implementation plan" to complete the construction works air pollution fee Internet online reporting system build job.
Another development in response to the EPA "pollution control construction projects and toll management information system" will be revised for the A2010 A2003 system, this project has been in 102 years on October 1 completed "Multiple Payment System" software updates (including barcode payment system single and batch reconciliation operations, counter bar code reconciliation, etc.), and with the department operating in 102 years on October 7 operating system synchronization is completed on-line work.
Second, regulatory inspections
In the current survey control for the purpose of reducing pollution of inspections from 3,006 at the time the project ended March 25 102 years to 102 years on December 31, has reached the pre-contract cost planning inspections target rate of 120%. City inspections of parts of the township in Nantou number up to 590; The total amount of pollution control inspections proportion of 93.7% in the amount of pollution county project, which determine pollution violations accounted for 91.6% of cases (cases in mind the following points 8:00) no significant pollution cases 7.5%; pollution situation serious cases (10 demerits points or more cases) accounted for 0.9%.
Third, project control
Negotiation 750 road sign pipeline project is waste land without landing undertaking, signed by the proportion of 81% the proportion of road pipeline project reporting; checking 607 times after another pipeline project during construction in the event of a serious lack of control over the site monthly counseling deletions are maintained at slightly missing the following.
Tube 15 major pollution dredging site meets seek counseling management practices, access to clean equipment and effective operation, transport vehicles tightly covered, kept clean and tidy work area around the road no tire marks, and limit the speed of the vehicle in the safe. Total audit during counseling 217 times.
Image transformation in promoting the site to promote the site Zhongxing Village fence beautify the demonstration area, the main area to Shengfu, Zhongzheng Road, Zhongxing Road, Minhang Road East, which consists of a ring around the block and major construction projects as the promotion of an object, a total of six sites with implementation.
EPA clean their homes with green mesh push for public construction projects receiving monthly online bulletin dirty now completed 58 exploration site entrance counseling pollution and improve the working period.
Another implementation of the road construction site to execute a total of 144 letters of adoption, adoption total mileage 2819.27 kilometers, about to cut TSP 38.91 tonnes less, PM10 7.39 tonnes.
Fourth, the dredging project control
102 annual maintenance dredging of tube 31, which includes the construction of eight standard, stoppages 6 standard, not the material 3 standard, has completed 14 standard, to declare the amount of debris 5,890,000 6,572 cubic meters, from 102 in March 25 102 years until October 31 the number of inspections completed 218 pieces, of which there are 168 non-missing "are missing cases, immediate improvement" to 24 "minor defect" 25, "serious deficiencies" as one.
LTK sidewalk maintenance dredging river transportation, maintenance and management of the nuclear project has four standard case, length 37 km, major pollution hot spots for the dredging project and general roads converge at a common outlet (station 16 lines 10.2K and 9.6K), through after this project, several rounds of consultations with river management agencies, has been Nantou County Public Works Department agreed to set up automatic car wash equipment exports to the two, and has been included in contract contract processed.
The plan to comply with the "stationary sources of air pollutant emission standards" perspective, the actual detection estimates, when TSP reached the perimeter road dust emissions standards (500 μg/Nm3), with daily traffic of about 3,000 largest sand vehicles / day, pursuant to estimate the maximum amount of dredging LTK pa system to no more than 7.8 million M3 principle.
Jurisdiction of the county survey debris processing industry processed approximately 12 million annual M3, and for the past five years than the total amount of earthwork dredging of the county, a preliminary assessment of dredged earth does Sinotrans washing place, you can try to implement.
To maintain air quality in the county, the plan handle Dredging automatic car wash equipment specifications surveys, performance review (including washing station forms, car wash station environment path after washing car dealers, car wash station specifications, pumping motor power, the nozzle head size, water well water quality, inspection instrumentation and wastewater treatment, etc.), and in October completed 102 automatic car wash equipment specifications revised to improve the performance of maintenance dredging washing station.
On the gravel trucks pollution control, has completed 20 standard transport flows dredging project to investigate and establish the whereabouts of each standard flow of pollution transport Dredging map data, statistics from 102 years ended April 1 to 102 of October 31, total, execution 6 stare Xiao operations of gravel trucks and 235 motorcycles were fixed video verification, a pass rate of 93.6%; this project in the year 101 and the Water Resources Agency River Management Office dredging fourth control point network connection to complete the job, during the project execution count 345 motorcycles connection stare whistle gravel vehicles, 72 motorcycles were found in the gravel car air filter is not covered, the pass rate of about 79.13%.
V. advocacy job
Apply for a tripartite counseling sessions Construction Engineering seminar for the county 12 construction projects located in Chung Hsing New Village property owners, contractors and supervision of its 12 manufacturing units for construction projects to encourage the construction industry who carry out site fence green landscaping.
Dredging handle a tripartite counseling sessions seminar for domestic Nantou County river management authorities at all levels, gravel Association and other units, hoping to maintain the air quality from the point of view of the total dredging works to control and deliberation in situ processing Sinotrans is not feasible to reduce the pollution load caused by the dredging project transportation, and the other is to effectively enhance the performance of the car wash station, also apply to amend dredging washing device specifications and draw on the premise started sending air pollution control plan books and other early warning management mechanism, please handle with the dredging project owners to jointly maintain air quality in Nantou County.
3 sessions handling construction projects and dredging works will be the case for counseling through experts committee for air pollution control measures as part of the work area and make recommendations for improvement to strengthen in order to reduce the impact of construction projects and maintenance dredging of air pollution on the environment.
Comply with the advent of the era of e-government, business website promotion outcomes presented electronically, including sending decree advocacy message press release 4.
Sixth, detection and analysis
Oil sample testing according to advocacy of process planning, monthly audit process in assisting the EPA conduct oil sampling tests on job completion times are 8:00 sampling tests during qualifying plan; another to understand the effectiveness of site control, monthly scheduled a large TSP site for site perimeter measurement, completed a total of four sites currently perimeter detection of particulate matter during program execution, the test results are within regulatory standards.
Seven, pollution reduction
Nantou County 102 years to estimate the full amount of the annual construction pollution reduction results of the trial, in which the total amount of fugitive dust was reduced an average of 513.7 metric tons / per month; total suspended particulates (TSP) in the reduction of approximately 143.3 tonnes of the average monthly amount of reductions ; PM10 reduction in the amount of the average monthly reduction in the amount of 79.6 tonnes of annual reduction of 102 metric tons of fugitive dust volume 596.2, up to a total reduction of 51.2%.