After this year plans starts the execution, first checks building which in recent years has not completed, from builds project Air pollution against system charge group Obtains the basic document, and deleted the project which already finished, the control object has the withdrawal big construction, either has the pollution possibility, or once by the resident was reported, either once by the environmental protection bureau punishment, or nearby the air quality inspection station the work site primarily. Moreover and in doing an inspection process in the control to carry on had not reported that the air pollution against system spends builds the project check to raise the newspaper environmental protection bureau charge to check the group to carry on the press for payment. This year controls builds the project to amount to 699.
Builds of statistical data the project construction area according to each kind to demonstrate that this year constructs the work site area total 1,406,161.2 square meters, east the important project the area has the financial group legal person Chiayi City Christianity hospital health care medical service building new construction, the newly built synthesis building and the activity space project, east the financial group legal person Chiayi City Christianity hospital the courtyard area outpatient service building new construction, the Chiayi City culture road culture square and the landscape style engineering effort - Chiayi City original bureau fine hospital wards off constructs the square project; After west the area has Chiayi City, lake pumping station and related dewatering excavation (2) pumping station, Jiayi ahead of time transportation transportation center new construction, Chiayi City i world virtuous National Elementary school activity center new construction and Yunjiana animal disease diagnostic center new construction and so on. The city level of contamination originates is mainly the RC construction, the path and other projects, accounts for 83.71%th whole city TSP year withdrawal, therefore key is at for this plan control, because after this year has Chiayi City, the lake pumping station and the related dewatering excavation (2) pumping station and so on important project carries on the work, therefore TSP of withdrawal other project is 96.88 metric tons, also accounts for 45.37%th Chiayi City TSP withdrawal.
Will construct the files work aspect in the information bank to be possible to divide into the copy clerk reference material, the computer file information bank two parts, the following will pick separately states explained:
I. Copy clerk reference material
The copy clerk reference material, divides into four parts: A. builds work site material B. contract unit material C. the contract award unit material D. tracing control material. And material of the contract unit and the contract award of unit is purer, covers its basic document separately and has jurisdiction over or work site of the contract, as for builds the work site material to contain has the basic document, the engineering work time interval data sheet, the pollution checks (patrols) looks up the data sheet and checks (patrols) consults investigates thoroughly the list and so on.
II. Computer file information bank
The computer file information bank the related work is more complex, scope of its covering besides constructs the copy clerk reference material input the files, inquiry, the statistics, the withdrawal the still permissible execution material push estimate and functions and so on report form series printing. Moreover, the computer constructed the files still to quantity huge electron photo album, according to control serial number and date complete establishment computer files.
In the coordinated work aspect, this year has completed four coordination meeting, calls together the object to build units and so on project owner, contractor, architect for this city. The first coordination meeting mainly aims at the path, the pipeline Engineer's unit, the number of persons present 16 people (mails number of units 24, attendance ratio 66.7%); The second coordination meeting mainly aims at the flaw points high architectural engineering, attends the work site several 14 people (to mail work site several 22, attendance ratio 63.6%); The third coordination meeting mainly aims at has continues this city to construct architect of the document, the attendance unit 7 people (mails unit 27, attendance ratio 25.93%); The fourth coordination meeting mainly aims at this city architecture industry entrepreneur and the contractor, the attendance unit 24 people (mails unit 80, attendance ratio 30%), following in view of has not attended the unit to provide works as the inferior coordination meeting correlation data, promotes this city to build uniformity of the work site control.
This year each work target figure with completes the situation detailed table to pick - 1 picks with the chart - 1, each work achievement abstract showing is as follows:
1.Does an inspection row tube 785 to build the work site.
2. Based on the policing method to standard of the work site graduation row tube, regarding arranges in order work site of the tube to complete checks (patrols) looks up 2167 times, achieves goal 100%.
3. The work site information bank establishes 2167, each material content includes the work site basic document, present situation work investigation and each time does an inspection with against system to record and so on.
4. Altogether completes 4 next best coordinated works.
5. In this year new declaration row tube 701 work sites, screens 10 work sites to carry on counselling, has completed 10 work sites to implement the experts to the scene counselling, following will carry on the counselling tracing work.
6. By checks (patrols) looks up controls the scene counselling or telephone tracing counselling reaches ratio of the pollution improvement to reach 100%.
7. In this plan checks does an inspection under the control, because the work site violates the air pollution against facture to carry out the punishment to count 1, because violates the reject cleaning up law to carry out the punishment to count 3, total accuses punishes 4, after reexamination all has completed the improvement, and will strengthen following checks does an inspection to control.
8. Before this plan 98 year TSP withdrawal control, the withdrawal is 284.73 metric tons, reduces the quantity is 158.19 metric tons, reduction rate reaches 48.49%.
9. This plan carries out the result for the promotion, this city work site carries on the palisade green beautification aspect, this year altogether completes the counselling palisade to beautify 30 green, the including 18 work site execution palisade advertisement, 3 work sites by the palisade colored drawing on pottery, 9 work sites plant the flowers and plants way to carry on the green beautification.
10. This plan altogether continues to carry on checks and counsels 24 spent clays not to fall to the ground the work, traces its following backfill, to lay down the condition one after another total to do an inspection to trace 29 times, and demonstration of as the other work site, reaches result of the comprehensive promoted, in the future will counsel the owner to counsel changes by CLSM (plastic low intensity) the grouting replaces the backfill folk recipe, maintains the path environment quality.
11. This plan total counsels completes 17 work sites to carry on when construction or finishes when the partial exposed vegetation to afforest, amounts to work site of its afforestation vegetation area the execution afforestation method to reach 24854.41m2.
12. Promotes 13 work site execution path to recognize raises the work, recognizes raises path 17, the grand total recognizes raises the length to amount to 18.9 kilometers, washes the street length is 1203.55km, the sweep street length is 374.1km, this plan execution checks 46 times, checks the result 'good' to account for 62.75%, 'ordinary' to account for 37.25%.