The implementation of this project focuses on assisting the Environmental Protection Agency to promote the inspection and control of water pollution sources and water quality monitoring in the area under its jurisdiction. It does grasp the current situation of water pollution prevention and control of water pollution sources within the jurisdiction of Yilan County, and supervises the management of the management through the inspection and control of the project. The business unit implements the operation and maintenance of the water pollution prevention and control facilities, and achieves the goal of improving the water quality of the stations in each jurisdiction. The results of the final report from January 24, 2007 to November 30, 2007 are as follows:
I. Assisting in the investigation of water pollution source management
(1) A total of 699 inspections of water pollution sources (including inspection, sampling and sample delivery in industrial areas), 607 in the execution part of the project, including 178 in industrial inspections, assisting in water sampling There were 105 inspections, and the 11-month inspections and industrial inspections were carried out, all of which have reached the annual target value of 100% or more.
(2) There are a total of 42 water pollution source management units in the key station of Dezikouxi, which is announced by the Environmental Protection Agency. During the planning period, a total of 33 inspections were carried out, and 37 cumulative implementations were carried out. The key stations were within the scope of pollution collection. The inspection control rate reached 79% (33/42), and the discharge water quality sampling was performed a total of 18 times.
(3) The implementation of the inspection of water pollution sources found that violations of the relevant provisions of the Water Pollution Law, after confirmation, the total number of disciplinary actions was 89, and the total fine was NT$15,617,527. According to the industry, the livestock industry (1) was cut 24 times, accounting for 27.0%, most of which were inconsistent with the results of the discharge water test; followed by the non-administrators, 23 cases, accounting for 25.8%; the third Food manufacturing, accounting for 7.9%. Among the violations, Article 7 of the Water Pollution Prevention Law is the most, followed by Article 18 of the Water Pollution Prevention Law, which accounts for 51.8% of the President's Office. Therefore, it is recommended that the continuous operation of the waste water treatment facilities in the future will be properly maintained and maintained. Regulations to comply with regulatory requirements.
Second, handle water pollution prevention permit review and database construction
(1) A total of 362 license examinations (675), the average number of license examinations was 9.1 days, of which 33 were due to the incomplete return of documents, and 51 applications were rejected due to data changes and corrections were overdue. The average number of days the water system is typed after the license is approved or issued is 1.0 days.
(2) Handling the management, construction, maintenance and renewal of the water pollution prevention permit document database, a total of 1,316 cases were executed, of which 697 were the number of audit records, and the license application cases (emission permit, water pollution prevention measures plan, construction) There were 556 pieces of construction site runoff wastewater reduction plan, and 63 cases were completed.
Third, functional evaluation and proper treatment of wastewater treatment facilities
(1) For the public and private places with improved space for the 107 wastewater treatment facilities, the preliminary evaluation of the functional evaluation of the secondary water pollution source wastewater treatment equipment, sampling, re-evaluation and negotiation of unit facilities have been completed.
(2) Completing the inspection work of 20 counseling institutions, and after the lack of counseling, reviewing the time limit for improvement, and completing 20 review operations, of which there are still 5 unfinished improvement operations, and follow-up will continue to track and provide improvement results. Give the Environmental Protection Agency a profit for follow-up related disposal.
4. Assist in the implementation of automatic monitoring of water quality and quantity and operation of video surveillance system
(1) A total of 7 operators in the county have completed the installation and connection of automatic monitoring facilities for waste (sewage) water. There is still one major violation target and two public sewerage businesses to be set up. The focus of this year is to maintain normal operation of the system. And analyze the monitoring results.
(2) Comparing the percentage of effective monitoring records of the seven business months, the percentage of effective monitoring records of the monthly water temperature, hydrogen ion concentration, conductivity and water volume automatic monitoring facilities of each factory reached more than 90%. In addition, the percentage of effective monitoring records of three automatic monitoring facilities for monitoring suspended solids and biochemical oxygen demand, such as Longde Sewage Treatment Plant, Lize Sewage Treatment Plant and Taihua Plant Longde Plant, averaged more than 80% per season.
(3) According to the results of the RATA report uploaded by the third plant such as the Longde Wastewater Treatment Plant, the SS and COD parts are in compliance with the applicable regulatory standards for the year after 107.
V. Regular water quality monitoring operations
(1) Complete the annual water quality sampling and testing of 22 river stations and 52 points.
(2) Complete 15 sampling points of water quality monitoring in the five major lakes.
6. Marine pollution prevention and emergency response operations
(1) Completed 201 inspections of port management, and 23 pieces (about 11.4%) of garbage or oil pollution were found on the surface of the sea. They were immediately notified to the management unit for processing and assisted in the follow-up review.
(2) Assisting in the conduct of a total of 50 ship inspection controls, and inspecting ship pollution damage insurance to reduce the probability and risk of pollution incidents.
(3) Performing water pollution emergency response equipment inventory maintenance operations and operation and maintenance twice a month to effectively grasp the strain energy and avoid damage to strain equipment.
(4) Assisting in the handling of one-time water pollution emergency response education and training, with a total of 23 participants, and strengthening the emergency response capability of responding personnel to water pollution.
VII. Water quality monitoring in the sea area
(1) Complete a total of 8 o'clock and 16 o'clock sea water quality monitoring operations, the progress rate is 100%.
(2) The water quality monitoring operation at the 12 o'clock port area was completed in the second quarter, and the progress rate was 100%.
Eight, publicity work
The water pollution plan webpage and the marine pollution promotion webpage are maintained and updated once every two weeks.
9. Submarine (drift) garbage removal treatment and marine environmental education promotion
(1) On June 9, 107, World Ocean Day, the activities of clean sea and marine environment education advocated the reduction of marine debris. A total of 220 people participated in the event, while 20 divers cleared about 105.9 kilograms of seabed garbage.
(2) Submarine (drift) garbage investigation and removal operations. In 107 years, 3 times have been handled, and 75 people have been dispatched for diving. The total amount of seabed garbage is 208 kg, of which non-resource garbage accounts for 92% and resource garbage accounts for 8%. The 3 times of submarine garbage disposal and the abandoned fish net accounted for up to 83%.
(III) Yuemingguo Small Marine Environmental Education Promotion Activities completed the “Guardian Beach” theme and inspired lectures in 1 session and the middle and lower grades of learning workshops in 4 stages and 12 sessions, totaling 13 sessions; by Yilan County Environmental Education Center Environmental Education Counseling The group completed a total of 6 missions for marine environmental education and publicity, with a total of 210 people.
10. Use of biogas slurry as a farmland fertilizer
(1) Handling the biogas slurry and biogas slurry as a plot for the use of farmland fertilizers, and 54 people participated in the production and sales of animal husbandry, township and village associations, mastering 12 livestock husbandry with the willingness to apply and 6 farmers willing to try The biogas slurry is used to water the agricultural crops.
(2) Promoting the application of the plan for the use of fertilizers for the biogas slurry and biogas residue in the animal husbandry, approved in 107 years, passed the trial and counseling, and assisted in writing one application plan each time to reduce the discharge of livestock waste water and reduce the pollution load of water bodies. .
XI. Assist in handling water environment related work
(1) 240 rivers and graffiti inspections were reported, with the distribution of Dongshan River, Annongxi, Yilan River and Dezikouxi as the main areas. The pollution on the riverbank was the highest in the proportion of general garbage, 79%, followed by Budailian blocking. 15% of the river, the third is dead fish or animal carcasses accounted for 6%.
(2) Assisting in the statistics of the number of flies monitoring points, mainly in the Nanshan and Jialan areas, the main reason is that the high-cold vegetable growing season is from May to July, and the use of cooked chicken manure is used to increase the accumulation of flies. The trend is to continue to strengthen farmers' proper management of fertilizer storage sites and to maintain environmental cleanliness and guidance to avoid breeding flies. The remaining stations have improved in 107 years.
12. Assisting in the collection of water pollution control fees
In the year of 107, we assisted in the 10,701 period (July-December, July, 2006) to confirm the collection of 208 objects, and the water pollution control fee was levied a total of 3,086,402 yuan. In July, we assisted the 10707 period (107-1-6 months) to confirm the object of collection. A total of 208, water pollution control fees levied a total of 4,125,708 yuan, a total of 107, a total of 7,212,110 yuan in 107 years, in line with the EPA's designated water quality inspection report suspected to check the object of a total of 16 are in compliance with the regulations.