In this (111) year, the monthly completion quantity and cumulative progress of various tasks have reached the contract specifications according to the scheduled progress, and the work completion rate is 100%. In addition to the requirement to achieve the quantity, the working team also requires to improve the quality. Therefore, the working group submits the monthly results report to the Environmental Protection Bureau for approval. For the detailed results of each work, please refer to the content of the subsequent chapters. The following is the current stage Executive summary description:
Since the implementation of the stationary pollution source licensing system, there are currently 92 listed factories that have issued operating permits, with a total of 119 operating permits, of which 42 have discharges that are up to the amount that should be declared by the Environmental Protection Agency. This year, we continued to handle the establishment and maintenance of the database of fixed pollution sources, and completed 42 inventory operations for the companies that announced the amount of emissions that should be declared. In addition to confirming the current situation of on-site pollution prevention and updating pollution emissions, the database was also updated and expanded. The data, in line with the inspection results of the Environmental Protection Agency, corrected 1,408 abnormal columns in the database every month. Compared with the same period last year, the database was correct, except that 96.5% in January 2011, 99.5% in May and 97.4 in November were lower than last year. 2, 3, 4, 6, 7, 8, 9, and 10 are all higher than last year, with an overall average of 99.1%.
In order to maintain good air quality in Hualien, this plan continues to promote air pollution reduction work. Among the operating permits that have been issued, a total of 3 processes have completed pollution emission reduction operations. The reduction methods include switching to low-polluting fuels, replacing control equipment, etc. , a total reduction of 166.8 metric tons of particulate pollutants, 34.5 metric tons of sulfur oxides and 163.3 metric tons of nitrogen oxides.
In the part of narrowing the implementation of the difference between the license and the actual situation, the negotiation has been conducted on the occasion of the second law publicity briefing session, and the guidance for public and private places to evaluate and reduce the number of license applications to 50% of the original license amount or double the actual operation amount is the negotiation goal. . This year, 17 public and private sites were invited, except for 4 that were not willing to cooperate with the reduction. The remaining 13 considered the market supply and demand and the application of the permitted emission amount was not easy. Allowable emissions of solids.
Hire experts and scholars to complete at least 4 pieces of license review contract specifications for the four major factories. At present, the four major factories have submitted a total of 4 applications for operating license changes, namely Asia Cement Co., Ltd. Hualien Manufacturing Plant (M01), (M02), Taiwan Cement Co., Ltd. The company's Heping Branch Heping Factory (M01) and China Pulp Co., Ltd. Hualien Factory (M02). In addition, in the operation part of the outsourced technician review, there are currently 2 applications for applications with "installation, modification, and operation" permits, namely New Hualien Stone Co., Ltd.-M01 Storage Yard Procedure and Quanwei Building Materials Co., Ltd.- M01 Dump program.
In terms of inspection and inspection management operations, a total of 2,511 inspection and inspection records were completed, including 1,097 inspections of compliance with the implementation of the plan (1,220 escapes) and 194 inspections. The major pollution sources are the main ones; in addition, the list of industrial zones has completed 256 inspections of compliance with industrial zone regulations, and the inspection rate is 100%. The discharge pipeline completed 5 times of dioxins and 4 times of heavy metals, and the results all met the emission standards. In addition, according to the inspection and testing results, a total of 8 cases were punished at this stage, with a total punishment amount of 2.64 million yuan, and the completion rate of improvement was 100%. In the missing part of the audit inspection, one case was found to be inconsistent after the permit (basic information and on-site procedures did not conform to the permit), and a fine of 100,000 yuan has been imposed in accordance with the regulations, and the industry is required to improve and submit an application for a permit change as soon as possible. The follow-up improvement has been completed.
For the collection of air pollution charges, the total amount collected in the third quarter of 2011 was 44,191,083 yuan, of which the highest was 16,895,078 yuan (38.23%) for the Asia Cement Hualien Plant, followed by 10,352,912 yuan (23.42%) for the Heping Power Plant, and 7,568,925 yuan for the TCC Heping Plant Yuan (17.12%), Zhonghua Pulp Mill 2,039,385 (4.61%), Asia Cement Co., Ltd. Hualien Manufacturing Plant (Xinchengshan Mine) 1,865,913 (4.22%). Regarding the part that the current air pollution fee rate is really difficult to motivate public and private places to deal with highly toxic substances, the working team has proposed through the local environmental protection bureau's air pollution fee visits from October 11 to 12, 2011, and learned that the department has already There is a plan to adjust the rate, but the promotion schedule has not yet been determined.
In terms of fugitive pollution source control, 1,220 inspections have been completed, 1,097 inspections of fugitive management methods have been completed, 917 vehicles have been followed by sand and gravel trucks, 81 road adoptions have been signed, and 1 set of vehicle identification systems in the port area and 2 rivers have been maintained. Dredging vehicle identification system; those who fail to comply with the inspection are required to complete the improvement work within a time limit. Continue to promote enterprises to adopt and clean roads with a total length of 63.8 kilometers. The total length of roads cleaned at this stage is 33,143.7 kilometers. The reduction of TSP is 457.4 tons, the reduction of PM10 is 86.8 tons, and the reduction of PM2.5 is 20.1 tons. The missing items in the inspection are mainly the insufficient coverage of sprinkler in the storage area, the color difference of the road surface of the vehicle path, and the insufficient pavement of the vehicle path each accounting for 21.4%. They all guide the industry to make improvements and track and review them until the improvement is completed.
The annual innovative approach is to improve the control of Hualien Port through the cooperation between the Hong Kong and the ring, and to improve the effectiveness of management and control through expert diagnosis. On May 24, the mobile CCTV installation monitoring road cleaning at the north end of the gravel truck lane (Zhongshan Bridge) was completed. Quality and prevention of material loss of freight vehicles; on June 10, experts and scholars will enter the port for diagnosis and on-site survey, and the department's inspection suggestions and Hong Kong company's improvement practices will be included in the focus of the site survey meeting. The Hong Kong company promises to complete the automatic car washing equipment on November 14 respectively The vibration function was improved, and the bidding for the "Taiwan Port Group Air Products Sensing Internet of Things Planning and Construction Plan" was completed in May. It is expected to complete the construction of relevant points by the end of the year, and complete the installation of shore power facilities at No. 12 yacht wharf and improve No. 15 marina Xun Wharf has shore power facilities. In addition, 12 sets of water mist machines (RMB 5.3 million) will be added for loading and unloading operations, damaged roads in the port area will be repaired (RMB 3 million), and 2 million RMB will be requested to clean the roads every year. About RMB 8.5 million will be invested in pollution improvement operations, hoping to improve the effectiveness of pollution control. Completed 6 times of pedestrian walkway monitoring operations extending from the Hualien Port entrance and exit to the Zhongshan Bridge on the outskirts of the port area. The average mass concentration of particles measured is 9~27 μg/m3 for PM2. The contribution of fine particles (PM2.5-10) is more significant than that of fine particles. Since the main source of pollution in this section is the large diesel vehicles transporting goods in the port area (sand and wood chips are the bulk), it is inferred that vehicle goods (especially sand and gravel) Cars) falling and driving dust are the main sources of pollution. In addition, 300 questionnaires were completed in the second stage, and the results showed that regular street sweeping was 65.0% satisfied with the improvement of dust pollution, indicating that most respondents were satisfied with it; Satisfaction with pollution was 28.0% in the first stage and 63.6% in the second stage, an increase of 35.3%. It is obvious that the strengthening of water sprinkling in the port area to improve the dust is more favorable to the people living near the entrance and exit of the port area. The proportion of those who are dissatisfied (or ineffective) with each pollution control does not exceed 10% (3~8%), those who are satisfied fall between 55% and 65%, and those who say it is ordinary fall between 32% and 41%. time, showing that the follow-up still needs to continue to promote and publicize.
In the in-depth inspection part, as of November 30, the two-stage expert diagnosis of Zhonghua Pulp Mill has been completed. There are a total of 17 suggestions. The factory responds that it will make improvements during the annual maintenance period (starting from August 17). The on-site inspection part of Zhonghua Pulp Mill currently has a total of 105 inspections and inspections, including 79 inspections (including 11 at night and 11 on holidays); there are a total of 18 missing inspections, mainly in one group with 8 missing items, followed by Recycling group 5 items. The second stage was completed on October 31, when experts and scholars entered the factory for review. In addition, the in-depth inspection of the Asia Clay Hualien factory was completed on August 25-26.
In addition to completing the work objectives of the contract specifications, the working team also submitted 6 items for negotiation on January 17, 2011 based on the negotiation items in the bargaining record, and incorporated them into the contract work items for implementation after approval by the Environmental Protection Bureau. Currently, they are all on schedule implement.